Skip to main content

Switchwire Electrical



For strata managers and committees

Strata electrician for common property across Sydney's Eastern Suburbs.

Lighting, power and switchboards in the shared parts of residential buildings. Our licensed team works from your work orders, quotes larger jobs before they go ahead, and plans around the people who live there.


Licence 150369C


Public liability insured

★★★★★

53 Google reviews

Switchwire Electrical service van parked outside a block of units

Licensed and insured

Licence 150369C. Public liability insured.

Findings in plain English

Inspections come with a written report and photos.

Quoted before work

Routine jobs by work order. Larger jobs quoted first.

Planned around residents

Access, notices and any shutdowns agreed with you.



Common property

Electrical work in the shared parts of your building.

In NSW, the owners corporation is responsible for maintaining and repairing common property, while owners look after their own lot. That's why common-area electrical requests usually come through the strata manager or committee, and it's the work this page is about.

Hallway, lobby and car park lighting

Failed fittings, faulty sensors and timers, and LED replacements in corridors, stairwells, lobbies, car parks and around the outside of the building.

Shared power and circuits

Power points and circuits in common laundries, garages, gardens and plant areas, and the circuits that supply shared equipment.

Main and common-area switchboards

Repairs, added safety switches and upgrades to the switchboards that supply common property.

Faults affecting shared areas

Tracing safety switches that keep tripping, dead circuits and intermittent faults that leave parts of the building without power.

Emergency and exit lights

Repairing and replacing emergency and exit light fittings in corridors and stairwells.

Work inside an apartment?

Repairs inside an individual lot are usually the owner's responsibility, not the owners corporation's.



Testing and inspections

Inspections and RCD testing.

Two different ways to check a building's common-area electrical equipment. We'll suggest which suits your situation and confirm the scope with you before booking.

01

Visual inspection

A walk-through of accessible common-area electrical equipment to spot damage, signs of overheating, missing covers and other visible defects.

02

RCD (safety switch) testing

Pressing the test button confirms a safety switch trips. The NSW Government recommends testing safety switches at least every six months, so they work when they're needed.

03

Written report with photos

After an inspection, you receive a written report with photos of what we found, so the strata manager and committee can review it and decide what to action.

04

What none of these do

No single inspection or test certifies a whole building or rules out hidden faults. Our report covers the scope we agreed with you. Any repairs go ahead by work order or, for larger jobs, after you approve our quote.



How it works

From a reported issue to approved work.

A structure that fits how strata decisions are made.

Step 1

Tell us about the building

The address, the problem or the testing you need, and who can approve the work.

Step 2

Scope confirmed

We agree what we'll look at and, where the issue needs to be seen, arrange to inspect it.

Step 3

Report and quote

Inspections are written up in a report with photos. Larger jobs are quoted, item by item.

Step 4

Approval

Routine jobs proceed on your work order. Larger jobs start once the strata manager or committee approves the quote.

Step 5

Work completed and tested

Approved work is carried out and tested. You then receive an invoice and, where the law requires one, a compliance certificate.



Shared buildings

Working in a building people live in.

Access and notices

Tell us how access works, whether that's keys, fobs, car park entry or a building manager on site, and whether residents need notice. We'll plan the visit around it.

Planned power shutdowns

Some switchboard work needs common-area power turned off. We'll explain what will be affected and agree a time with you before any planned shutdown.

Quotes the committee can consider

For larger jobs that need committee approval, we set out each item and its cost so it can be considered and approved.

Recurring maintenance

If the building has recurring electrical needs, such as regular RCD testing or common-area lighting checks, talk to us about an ongoing arrangement that suits the scheme.



Recent work

Common-area lighting at a unit block.

External lighting at a residential building entry, before and after we upgraded it to LED.

Unit block entry with older external light fittings

Before: the entry with its older external fittings

New exterior lighting at a unit block entry

After: the same entry with new LED lighting



Service area

Where we work.

From our Eastlakes base, we look after residential strata buildings across Sydney's Eastern Suburbs, the inner city, the Inner West and Georges River.

Suburbs we cover include

Request a quote for your building

Tell us the building address, the common-area issue or testing you need, and who will approve the work. Include your work order number if you have one.

Thanks, we've got your enquiry. We'll be in touch to confirm the scope and arrange access to the building. If you'd prefer to talk it through, call us on 0404 846 845.

I am a*

We only use your details to reply to this enquiry.



FAQ

Questions from strata managers and committees.

Have a question about your building? Call us on 0404 846 845.

Do you work on common property or inside individual apartments?

This page covers common property: the shared lighting, power, switchboards and equipment the owners corporation is responsible for. Work inside an apartment is usually arranged by the owner or their property manager, and we can help with that separately.

Do you work from strata work orders?

Yes. Routine strata jobs are carried out under your work order. For larger jobs, we provide a quote for the strata manager or committee to approve before the work goes ahead.

Can you inspect our common-area electrical equipment and tell us what needs attention?

Yes. We agree the scope first, inspect what's included, then send you a written report with photos. Smaller repairs can go ahead on your work order, and larger ones are quoted for approval.

Can you arrange RCD testing for common areas?

Yes. Let us know which areas or switchboards you want covered and we'll confirm the scope before booking. Testing shows whether each safety switch trips as it should. It doesn't certify the whole building.

Do you complete our annual fire safety statement?

No. An annual fire safety statement requires assessment by an accredited practitioner (fire safety). We can repair or replace emergency and exit light fittings that need attention.

What do we receive after the work?

For work orders and quoted jobs, an invoice describing the work and any electrical compliance certificate the work requires. For inspections, a written report with photos.

How do you handle work that affects residents?

We agree access arrangements and any resident notices with you beforehand. If common-area power needs to go off, we explain what will be affected and agree a time first.

Can we set up ongoing maintenance for the building?

Yes, talk to us about what the building needs, such as regular RCD testing or lighting checks, and we'll agree an arrangement and scope with you.

Common-area electrical issue on the agenda?

Call to talk it through, or send the building details and we'll come back to you to confirm the scope.

Switchwire Electrical service van